image description

Road construction updates

July 22nd, 2016 by WCBC Radio

Garrett County

·       I-68 (National Freeway) between US 219 and Shade Hollow Road – Resurfacing – Single lane closures from 6 a.m. until 6 p.m.

 

  • US 40 Alt. (National Pike) between US 219 (Chestnut Ridge Road) and Green Lantern RoadResurfacing – Single lane closures with flagging operations between 9 a.m. and 3 p.m., Mondays through Fridays.

Washington County

 

·       I-70 between MD 56 (Big Pool Road) and Boyd Road – Resurfacing – Single lane and shoulder closures Sundays through Thursday from 8 p.m. until 5 a.m. 

 

·       Northbound I-81 between I-70 and Halfway Boulevard – Merge/auxiliary lane construction – Narrow and shortened ramps. 

 

Leave a Reply